House Repair and Refurbish Schedule

April, 2005

Phase 1 – Essential Projects to Re-open the Chapter House

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Room Doors

 

 

Alley Steel Door

Replace all damaged doors

Door hardware

Locksets  (Medico same as BC)

 

 

 

             Estimate $7,500.

2

General Painting

Dorm Rooms

Halls

Exterior Doors and Frames

Interior Door Frames

Chapter Room

Great Hall

Rest Rooms and Shower and Ceiling

Repair water damaged drywall

 

 

$7,500. 

Perfection Painting

3

Window Coverings

 

Library

Vertical Blinds on all windows (PVC)

 

Remove and install carpet

Remove and install new wall paper

 

$6,500

Jamison Carpets

4

Electrical Repairs

·      Inspect all wiring, breakers, receptacles, switches, fire alarm system and smoke detectors.

·      Replace all 10 dorm room ceiling lights with 2’ x 4’ florescent fixtures

·      Repair exterior pole lights

 

 

$5,500.

United Electric

         

5

Plumbing Repairs

Inspect all plumbing.  Upgrade shower room:  urinals, fixtures

 

          Estimate $2,000.

6

HVAC Unit Repair

·      New room units - 12 heat/ac units ($14,000 total).

·      Entry Heaters – 3 each
($1,350 total).

 

 

$15,350.

Johnson Boiler

 

 

 

 

 

 

 

Total:    $ 44,350.

Phase 2 – Less Critical Projects, can be delayed but are needed

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Furniture

Dorm Room furniture

General Quarters furniture

(minor repairs and cleaning)

 

          Estimate $3,000.

2

Landscaping upgrade

·      Shrub beds revamped

·      Trees trimmed 

·      New and replacement shrubs as needed

 

 

 

 

         Estimate $5,000.

3

Boiler Heat Revamp

 

   

         Estimate $7,500.

4

Shower  HVAC

 

Replace baseboard heaters with ceiling unit.  Room ventilation.

 

         Estimate $3,500

5

Shower Room

Partitions to accommodate millennium students

         Estimate $2,000.

 

 

 

 

 

 

 

Total:       $21,000.

Phase 3 – Wish List Projects

No.

Item Name

Scope of Work

Projected Cost / Reference Contractor

1

Security camera

 

         Estimate $8,000.

2

House Decorating

·      Beta emblems

·      Pictures

 

 

         Estimate $3,000.

 

 

 

Total:            $11,000.

 

 

 

Grand total

                      $76,350.

 